Reliability
Centered Maintenance Returns Benefits
Reliability centered maintenance lets manufacturers maximize revenue
and keep processes in control.
Quality Magazine, February,
2000
Link not available. Call for copy of Article |
|
| |
|
|
Keeping Facilities Fit
Some federal agencies are using predictive technologies to identify
and correct equipment problems before failures occur.
The Military Engineer,
November, 2001
Link not available. Call for copy of Article |
|
| |
|
|
Columbia Gas
Transmission Corporation Models Operational Excellence by Integrating
RCM and Work Management
Presented at the Reliability Conference, April 1999, Cincinnati, OH |
| In
an effort to achieve operational excellence, Columbia Gas Transmission
corporation felt it imperative to capture all of the financial and
efficiency savings associated with an optimized maintenance process.
The variability in their maintenance plans and procedures across
seven states needed to be standardized. An integrated implementation
of RCM and CMMS would provide the tools and process to achieve those
goals. |
|
| |
|
|
A Maintenance Optimization
Success Story
A Case Study for Improved Reliability and Profit Generation
Presented at the Reliability Conference, April, 1997, Phoenix, AZ. |
| This
paper describes the maintenance optimization program that was installed
and implemented at Dayton Power & Light. The primary target
of this program was for equipment reliability improvement, O&M
budget reduction, and extension of capital asset purchases associated
with substation equipment. |
|
| |
|
|
Incorporate RCM into
acceptance testing to detect latent defects
... Avoid warranty issues and premature failure
Presented at the 2001 International Joint Power Generation Conference,
New Orleans, LA |
| This
paper describes the need for RCM based technologies during acceptance,
with examples from previous projects. It also develops the complete
justification and model format for using RCM in the entire process
from procurement through acceptance. |
|
| |
|
|
Use RCM for
Acceptance Testing to Detect Installation Defects
..... Avoid premature failure
Presented at the Reliability Conference, April, 2001, Phoenix, AZ |
| This
paper describes the need for RCM based technologies during the equipment
design and acceptance phases of commissioning. It develops the justification
for using RCM in the entire process from procurement through acceptance.
|
|
| |
|
|
Capacity
Improvement Through Maintenance Optimization
5 Essential Elements For Every Asset Management Program
Presented at the Hydrocarbon Processing Optimization
Conference, April, 1997, Houston, TX. |
| This
paper describes the essential elements associated with re-engineering
plant operations and maintenance for improved capacity while simultaneously
improving equipment reliability and lowering maintenance costs.
|
|
| |
|
|
Substation
Maintenance Optimization Program
Presented at the Distributech '98 Conference,
Tampa, FL. |
| This
paper describes the maintenance optimization program that was installed
and implemented at Dayton Power & Light. This paper provides
additional results and lessons learned to the paper that was presented
at the Reliability conference eight months earlier. |
|
| |
|
|
Integrating
SCADA, Diagnostics and CMMS for a World Class On-Line Diagnostic
System
Presented at the Reliability Conference, April,
1998, Charlotte, NC.
|
| This
paper provides results of a RAM (Reliability, Availability, and
Maintainability) study outlining a detailed plan for optimizing
maintenance for TVA's substation operation. It included implementation
of an on-line expert system. |
|
| |
|
|
Chemical
Plant Productivity Doubles after Three Months of Overall Equipment
Effectiveness (OEE) Measurement
You Can’t Improve What You Can't Measure
Presented at the Reliability Conference, April,
2001, Phoenix, AZ
|
| Manganese
ore processing is a hot, hard and dirty business, leading to excessive
breakdowns, minor stoppages, quality rejects, and startup losses.
This paper describes how one chemical company started to measure
OEE and doubled their production within three months. |